View bid details 3 - RenoTender

View bid details 3

Quotation

at

Date of Submission: 01 Jan 1970
Date of Expiry: 01 Jan 1970
Renovation Date: 01 Jan 1970

Place Type:
Size: sqft
House Type:
Floor Plan: View
Received Keys:
Hand-Drawn Layout: View
House Status:
Additional Comments:

Spaces to Renovate

Others For the Whole House
Entrance Foyer
Kitchen
Living
Dining
Master Bedroom
Common Beroom
Master Bathroom
Common Bathroom
Kitchen Bathroom
Living Bathroom
Balcony

Quotation Details

Delivery Lead Time from Time of Award

months

Notes to Buyer

Proposal Validity

months

Quotation PDF

View

Generated Quotation PDF

View

Renovation Services (In SGD exclusive of GST)

Works For Whole House

Service Type Work Required Sub-Total (Excl GST) Additional Comments
Pre Works Preparation and Protection Works Installation of plywood for protection to whole house 100 Fake Comment
Installation of plastic drop sheet and corrugated paper, cover for furnitures 100
Other Preparation/Protection Works Required

Sample other preparation work description

100
Electrical Works Whole house rewiring 100 Fake Comment
Change/upgrade of Electric Distribution box 100
Other Electrical Works

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Painting Works Standard HDB height with standard 2–3 coat wall for whole house and ceiling painting with no touch up required 100 Fake Comment
Other Painting Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Cleaning Works General cleaning of the entire house 100 Fake Comment
Acid and chemical wash for affected areas 100
Air Quality Assessment and Removal 100
Other Cleaning Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100

Entrance Foyer 1

Service Type Work Required Sub-Total (Excl GST) Additional Comments
False Ceiling, Partition and Plastering Works Dismantle existing false ceiling 100 Fake Comment
Install new plasterboard ceiling with skim coat finish 100
Construct aircon pelmet to conceal the aircon blower 100
Box up all aircon trunking 100
Construct curtain pelmet to conceal curtain tracks 100
Construct partition walls / dividers 100
Other Ceiling/Partition Works Required

Additional ceiling modifications as per design requirements

100
Carpentry Works Existing built-in wooden structures to be dismantled and disposed by contractor 100 Fake Comment
Custom and Build Ceiling Height Shoe Cabinet 100
Design and Build Featured Wall at Foyer Entrance 100
Replacement of Existing Main Door with New Fire-rated Door 100
Other Carpentry Works Required

Custom woodwork and installation services

100
Grille Works Replace and Install door grille (no existing grilles to remove) 100 Fake Comment
Other Grille Works Required

Additional security grille installations

100
Electrical Works Wiring Method: Conduit Wiring 100 Fake Comment
Number of new power points: 3 100
Number of data points: 2 100
Number of fan points: 1 100
Number of lighting points: 4 100
Number of CCTV points: 1 100
Smart Home Installations (e.g. curtains, lightings) 100
Other Electrical Works Required

Additional electrical installations and upgrades

100
Aircon Works Number of Aircon Required: 1 100 Fake Comment
Aircon Piping Method: Concealed Piping 100
Type of Aircon: Split Unit 100
Wall and Floor Works Choose Wall Works: Painting 100 Fake Comment
Choose Wall Finishing: Emulsion Paint 100
Choose Floor Works: Tiling 100
Choose Floor Finishing: Ceramic Tiles 100

Kitchen 1

Service Type Work Required Sub-Total (Excl GST) Additional Comments
False Ceiling, Partition and Plastering Works Dismantle existing false ceiling 100 Fake Comment
Install new false ceiling 100
Construct aircon pelmet to conceal the aircon blower 100
Box up all aircon trunking 100
Construct curtain pelmet to conceal curtain tracks 100
Construct partition walls / dividers 100
Other Ceiling/Partition Works Required

Custom ceiling work as specified

100
Carpentry Works Existing built-in wooden structures to be dismantled and disposed of by contractor 100 Fake Comment
Custom and build top hung cabinet (Depth < 300mm) and bottom cabinets (Depth ≤ 600mm) 100
Custom and build tall unit for built-in microwave and oven 100
Custom and build an island with bottom storage 100
Build concrete base below all cabinets 100
Install Kitchen Door: Sliding Door 100
Kitchen Door Material: Laminate 100
Other Carpentry Works Required

Custom carpentry work as specified

100
Kitchen/Counter Table Top Material Selection Quartz countertop material 100 Fake Comment
Window and Grille Works Replace and install window grille (Standard grille) 100 Fake Comment
Remove wall/window/door between kitchen and service yard (includes re-tiling and leveling) 100
Change and replace window panels 100
Other Window and Grille Works Required

Custom window work as specified

100
Electrical Works Wiring Method: Surface Wiring 100 Fake Comment
Number of new power points: 5 100
Number of data points: 2 100
Number of fan points: 1 100
Number of lighting points: 3 100
Number of CCTV points: 1 100
Smart Home Installations (e.g. curtains, lightings) 100
Other Electrical Works Required

Custom electrical work as specified

100
Aircon Works Number of Aircon Required: 1 100 Fake Comment
Aircon Piping Method: Surface Piping 100
Type of Aircon: Split Unit 100
Plumbing Works Connect water supply and drainage for kitchen sink 100 Fake Comment
Extend additional water point: 1 point 100
Relocate washing machine inlet/outlet point 100
Other Plumbing Works Required

Custom plumbing work as specified

100
Wall and Floor Works Choose Wall Works: Tiling 100 Fake Comment
Choose Wall Finishing: Ceramic Tiles 100
Choose Floor Works: Tiling 100
Choose Floor Finishing: Porcelain Tiles 100

Living Room 1

Service Type Work Required Sub-Total (Excl GST) Additional Comments
False Ceiling, Partition and Plastering Works Dismantle existing false ceiling 100 Fake Comment
Construct standard false ceiling with downlight holders 100
Construct aircon pelmet to conceal the aircon blower 100
Box up all aircon trunking 100
Construct curtain pelmet to conceal curtain tracks 100
Construct partition walls / dividers 100
Other Ceiling/Partition Works Required

Additional ceiling work requirements

100
Carpentry Works Existing built-in wooden structures to be dismantled and disposed of by contractor 100 Fake Comment
Custom and build TV Feature Wall 100
Custom and build TV Console with storage 100
Custom and build Full Height Divider With Storage 100
Custom and build Feature Wall Cladding or Fluted Panel 100
Custom and build Bay Window With Settee & Bottom Storage 100
Custom and build Display cabinets with storage 100
Replacement of Existing Main Door with New Fire-rated Door 100
Other Carpentry Works Required

Additional carpentry requirements

100
Window and Grille Works Replace and install window grille (Standard) 100 Fake Comment
Change and replace window panels 100
Other Window and Grille Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Electrical Works Wiring Method: Concealed Wiring 100 Fake Comment
Number of new power points: 5 100
Number of data points: 3 100
Number of fan points: 2 100
Number of lighting points: 8 100
Number of CCTV points: 2 100
Smart Home Installations (e.g. curtains, lightings) 100
Other Electrical Works Required

Additional electrical work requirements

100
Aircon Works Number of Aircon Required: 6 100 Fake Comment
Aircon Piping Method: Conceal Aircon Piping 100
Type of Aircon: Ducted Central Aircon 100
Wall and Floor Works Choose Wall Works: Revarnish Wood Floor 100 Fake Comment
Choose Wall Finishing: Timber Wood 100
Choose Floor Works: Overlay 100
Choose Floor Finishing: Marble 100
Other Flooring Selection Works Required

Please describe any other specific requests here.

100

Dining Room 1

Service Type Work Required Sub-Total (Excl GST) Additional Comments
False Ceiling, Partition and Plastering Works Dismantle existing false ceiling 100 Fake Comment
Construct standard false ceiling with downlight holders 100
Construct aircon pelmet to conceal the aircon blower 100
Box up all aircon trunking 100
Construct curtain pelmet to conceal curtain tracks 100
Construct partition walls / dividers 100
Other Ceiling/Partition Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Carpentry Works Existing built-in wooden structures to be dismantled and disposed of by contractor 100 Fake Comment
Custom and build Feature Wall (e.g. Full Height Mirror) 100
Custom and build Display Cabinets 100
Custom and build Island 100
Other Carpentry Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Window and Grille Works Replace and install window grille (no old grilles) 100 Fake Comment
Change and replace window panels 100
Other Window and Grille Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Electrical Works Wiring Method: Conceal Wiring 100 Fake Comment
Number of new power points 100
Number of data points 100
Number of fan points 100
Number of lighting points 100
Number of CCTV points 100
Smart Home Installations (e.g. curtains, lightings) 100
Other Electrical Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Aircon Works Number of Aircon Required: 6 100 Fake Comment
Aircon Piping Method: Conceal Aircon Piping 100
Type of Aircon: Ducted Central Aircon 100
Wall and Floor Works Choose Wall Works: Revarnish Wood Floor 100 Fake Comment
Choose Wall Finishing: Timber Wood 100
Choose Floor Works: Overlay 100
Choose Floor Finishing: Marble 100
Other Flooring Selection Works Required

Please describe any other specific requests here.

100

Master Bedroom 1

Service Type Work Required Sub-Total (Excl GST) Additional Comments
False Ceiling, Partition and Plastering Works Dismantle existing false ceiling 100 Fake Comment
Construct standard false ceiling with downlight holders 100
Construct aircon pelmet to conceal the aircon blower 100
Box up all aircon trunking 100
Construct curtain pelmet to conceal curtain tracks 100
Construct partition walls / dividers 100
Other Ceiling/Partition Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Carpentry Works Existing built-in wooden structures to be dismantled and disposed of by contractor 100 Fake Comment
Custom and Build Wardrobe with Sliding Door 100
Wardrobe Material: Glass 100
Custom and Build Bedframe / Platform Bed 100
Include Headboard 100
Custom and Build TV Feature Wall 100
Custom and Build TV Console 100
Custom and Build Vanity Table 100
Custom and Build Study Table 100
Custom and Build Book Shelf / Display Cabinets 100
Replacement of Door and Door Frame 100
Other Carpentry Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Window and Grille Works Replace and install window grille (no old grilles) 100 Fake Comment
Change and replace window panels 100
Other Window and Grille Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Electrical Works Wiring Method: Conceal Wiring 100 Fake Comment
Number of new power points 100
Number of data points 100
Number of fan points 100
Number of lighting points 100
Number of CCTV points 100
Smart Home Installations (e.g. curtains, lightings) 100
Other Electrical Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Aircon Works Number of Aircon Required: 6 100 Fake Comment
Aircon Piping Method: Conceal Aircon Piping 100
Type of Aircon: Ducted Central Aircon 100
Wall and Floor Works Choose Wall Works: Revarnish Wood Floor 100 Fake Comment
Choose Wall Finishing: Timber Wood 100
Choose Floor Works: Overlay 100
Choose Floor Finishing: Marble 100
Other Flooring Selection Works Required

Please describe any other specific requests here.

100

Common Bedroom 1

Service Type Work Required Sub-Total (Excl GST) Additional Comments
False Ceiling, Partition and Plastering Works Dismantle existing false ceiling 100 Fake Comment
Construct standard false ceiling with downlight holders 100
Construct aircon pelmet to conceal the aircon blower 100
Box up all aircon trunking 100
Construct curtain pelmet to conceal curtain tracks 100
Construct partition walls / dividers 100
Other Ceiling/Partition Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Carpentry Works Existing built-in wooden structures to be dismantled and disposed of by contractor 100 Fake Comment
Custom and Build Wardrobe with Sliding Door 100
Wardrobe Material: Glass 100
Custom and Build Bedframe / Platform Bed 100
Include Headboard 100
Custom and Build TV Feature Wall 100
Custom and Build TV Console 100
Custom and Build Vanity Table 100
Custom and Build Study Table 100
Custom and Build Book Shelf / Display Cabinets 100
Replacement of Door and Door Frame 100
Other Carpentry Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Window and Grille Works Replace and install window grille (no old grilles) 100 Fake Comment
Change and replace window panels 100
Other Window and Grille Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Electrical Works Wiring Method: Conceal Wiring 100 Fake Comment
Number of new power points 100
Number of data points 100
Number of fan points 100
Number of lighting points 100
Number of CCTV points 100
Smart Home Installations (e.g. curtains, lightings) 100
Other Electrical Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Aircon Works Number of Aircon Required: 6 100 Fake Comment
Aircon Piping Method: Conceal Aircon Piping 100
Type of Aircon: Ducted Central Aircon 100
Wall and Floor Works Choose Wall Works: Revarnish Wood Floor 100 Fake Comment
Choose Wall Finishing: Timber Wood 100
Choose Floor Works: Overlay 100
Choose Floor Finishing: Marble 100
Other Flooring Selection Works Required

Please describe any other specific requests here.

100

Master Bathroom 1

Service Type Work Required Sub-Total (Excl GST) Additional Comments
False Ceiling, Partition and Plastering Works Dismantle existing false ceiling 100 Fake Comment
Construct standard false ceiling with downlight holders 100
Other False Ceiling, Partition and Plastering Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Carpentry Works Existing built-in wooden structures to be dismantled and disposed of by contractor 100 Fake Comment
Custom and Build Vanity Bottom Cabinet (with storage) up to 600mm depth 100
Custom and Build Additional built-in storage cabinets 100
Replacement of bathroom entrance door and frame 100
Door Material: Wood 100
Other Carpentry Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Kitchen/Counter Table Top Material Selection Kompac Plus 100 Fake Comment
Masonry Works Existing brick walls or constructed bathtubs to be removed 100 Fake Comment
Other Masonry Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Wall and Floor Works Choose Wall Works: Revarnish Wood Floor 100 Fake Comment
Choose Wall Finishing: Timber Wood 100
Choose Floor Works: Overlay 100
Choose Floor Finishing: Marble 100
Other Flooring Selection Works Required

Please describe any other specific requests here.

100
Glass and Aluminium Works Bathroom glass shower screen with swing door 100 Fake Comment
Other Glass and Aluminium Works Required

Please describe any other specific requests here.

100
Plumbing Works Existing basin, WC to dismantle and dispose 100 Fake Comment
Hot and Cold water for all taps 100
Select Piping Method: Re-locate Water Points 100
Select W.C Type: WC with Electrical 100
Select Heater Type: Standard Shower 100
Extension of additional water point: 3 100
Installation of Bidet Point 100
Other Plumbing Works Required

Please describe any other specific requests here.

100
Electrical Works Wiring Method: Conceal Wiring 100 Fake Comment
Number of new power points 100
Number of data points 100
Number of fan points 100
Number of lighting points 100
Smart Home Installations (e.g. curtains, lightings) 100
Other Electrical Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100

Common Bathroom 1

Service Type Work Required Sub-Total (Excl GST) Additional Comments
False Ceiling, Partition and Plastering Works Dismantle existing false ceiling 100 Fake Comment
Construct standard false ceiling with downlight holders 100
Other False Ceiling, Partition and Plastering Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Carpentry Works Existing built-in wooden structures to be dismantled and disposed of by contractor 100 Fake Comment
Custom and Build Vanity Bottom Cabinet (with storage) up to 600mm depth 100
Custom and Build Additional built-in storage cabinets 100
Replacement of bathroom entrance door and frame 100
Door Material: Wood 100
Other Carpentry Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Kitchen/Counter Table Top Material Selection Kompac Plus 100 Fake Comment
Masonry Works Existing brick walls or constructed bathtubs to be removed 100 Fake Comment
Other Masonry Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Wall and Floor Works Choose Wall Works: Revarnish Wood Floor 100 Fake Comment
Choose Wall Finishing: Timber Wood 100
Choose Floor Works: Overlay 100
Choose Floor Finishing: Marble 100
Other Flooring Selection Works Required

Please describe any other specific requests here.

100
Glass and Aluminium Works Bathroom glass shower screen with swing door 100 Fake Comment
Other Glass and Aluminium Works Required

Please describe any other specific requests here.

100
Plumbing Works Existing basin, WC to dismantle and dispose 100 Fake Comment
Hot and Cold water for all taps 100
Select Piping Method: Re-locate Water Points 100
Select W.C Type: WC with Electrical 100
Select Heater Type: Standard Shower 100
Extension of additional water point: 3 100
Installation of Bidet Point 100
Other Plumbing Works Required

Please describe any other specific requests here.

100
Electrical Works Wiring Method: Conceal Wiring 100 Fake Comment
Number of new power points 100
Number of data points 100
Number of fan points 100
Number of lighting points 100
Smart Home Installations (e.g. curtains, lightings) 100
Other Electrical Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100

Kitchen Bathroom 1

Service Type Work Required Sub-Total (Excl GST) Additional Comments
False Ceiling, Partition and Plastering Works Dismantle existing false ceiling 100 Fake Comment
Construct standard false ceiling with downlight holders 100
Other False Ceiling, Partition and Plastering Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Carpentry Works Existing built-in wooden structures to be dismantled and disposed of by contractor 100 Fake Comment
Custom and Build Vanity Bottom Cabinet (with storage) up to 600mm depth 100
Custom and Build Additional built-in storage cabinets 100
Replacement of bathroom entrance door and frame 100
Door Material: Wood 100
Other Carpentry Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Kitchen/Counter Table Top Material Selection Kompac Plus 100 Fake Comment
Masonry Works Existing brick walls or constructed bathtubs to be removed 100 Fake Comment
Other Masonry Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Wall and Floor Works Choose Wall Works: Revarnish Wood Floor 100 Fake Comment
Choose Wall Finishing: Timber Wood 100
Choose Floor Works: Overlay 100
Choose Floor Finishing: Marble 100
Other Flooring Selection Works Required

Please describe any other specific requests here.

100
Glass and Aluminium Works Bathroom glass shower screen with swing door 100 Fake Comment
Other Glass and Aluminium Works Required

Please describe any other specific requests here.

100
Plumbing Works Existing basin, WC to dismantle and dispose 100 Fake Comment
Hot and Cold water for all taps 100
Select Piping Method: Re-locate Water Points 100
Select W.C Type: WC with Electrical 100
Select Heater Type: Standard Shower 100
Extension of additional water point: 3 100
Installation of Bidet Point 100
Other Plumbing Works Required

Please describe any other specific requests here.

100
Electrical Works Wiring Method: Conceal Wiring 100 Fake Comment
Number of new power points 100
Number of data points 100
Number of fan points 100
Number of lighting points 100
Smart Home Installations (e.g. curtains, lightings) 100
Other Electrical Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100

Living Bathroom 1

Service Type Work Required Sub-Total (Excl GST) Additional Comments
False Ceiling, Partition and Plastering Works Dismantle existing false ceiling 100 Fake Comment
Construct standard false ceiling with downlight holders 100
Other False Ceiling, Partition and Plastering Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Carpentry Works Existing built-in wooden structures to be dismantled and disposed of by contractor 100 Fake Comment
Custom and Build Vanity Bottom Cabinet (with storage) up to 600mm depth 100
Custom and Build Additional built-in storage cabinets 100
Replacement of bathroom entrance door and frame 100
Door Material: Wood 100
Other Carpentry Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Kitchen/Counter Table Top Material Selection Kompac Plus 100 Fake Comment
Masonry Works Existing brick walls or constructed bathtubs to be removed 100 Fake Comment
Other Masonry Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Wall and Floor Works Choose Wall Works: Revarnish Wood Floor 100 Fake Comment
Choose Wall Finishing: Timber Wood 100
Choose Floor Works: Overlay 100
Choose Floor Finishing: Marble 100
Other Flooring Selection Works Required

Please describe any other specific requests here.

100
Glass and Aluminium Works Bathroom glass shower screen with swing door 100 Fake Comment
Other Glass and Aluminium Works Required

Please describe any other specific requests here.

100
Plumbing Works Existing basin, WC to dismantle and dispose 100 Fake Comment
Hot and Cold water for all taps 100
Select Piping Method: Re-locate Water Points 100
Select W.C Type: WC with Electrical 100
Select Heater Type: Standard Shower 100
Extension of additional water point: 3 100
Installation of Bidet Point 100
Other Plumbing Works Required

Please describe any other specific requests here.

100
Electrical Works Wiring Method: Conceal Wiring 100 Fake Comment
Number of new power points 100
Number of data points 100
Number of fan points 100
Number of lighting points 100
Smart Home Installations (e.g. curtains, lightings) 100
Other Electrical Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100

Balcony 1

Service Type Work Required Sub-Total (Excl GST) Additional Comments
False Ceiling, Partition and Plastering Works Dismantle existing false ceiling
100

Fake Comment

Construct standard false ceiling with downlight holders
100
Other False Ceiling, Partition and Plastering Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Window and Grille Works Replace and install window grille (no old grilles)
100

Fake Comment

Change and replace window panels
100
Other Window and Grille Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Electrical Works Wiring Method: Conceal Wiring
100

Fake Comment

Number of new power points
100
Number of data points
100
Number of fan points
100
Number of lighting points
100
Smart Home Installations (e.g. curtains, lightings)
100
Other Electrical Works Required

Lorem ipsum dolor sit amet, this is a sample free text content displayed as paragraph.

100
Aircon Works Number of Aircon Required: 6
100

Fake Comment

Aircon Piping Method: Conceal Aircon Piping
100
Type of Aircon: Ducted Central Aircon
100
Wall and Floor Works Choose Wall Works: Revarnish Wood Floor
100

Fake Comment

Choose Wall Finishing: Timber Wood
100
Choose Floor Works: Overlay
100
Choose Floor Finishing: Marble
100
Other Flooring Selection Works Required

Please describe any other specific requests here.

100

Total Quotation Price (excluding GST)

$

Why you should choose as your preferred trading partner ?

At ,

Verified by MonsterInsights